Купить корпус для промышленного ПК ACP-4020 от производителя Advantech.
Корпуса для промышленных компьютеров по выгодной цене в Москве в интернет-магазине Corson.ru («Корсон Технолоджис Рус»).
| ACP-4020BP-00XE | ACP-4020MB-00XE | ||
|---|---|---|---|
| Disk Drive Bay | Slim ODD | 1 | 1 |
| 2.5" Internal | 1 | 1 | |
| 3.5 External Bay | 2 | ||
| Miscellaneous | LED Indicators | Power, HDD, temperature, fan, LAN1, and LAN2 | Power, HDD, temperature, fan, LAN1, and LAN2 |
| Rear Panel | One 9-pin D-Sub opening | Five 9-pin D-Sub & one 68-pin SCSI openings | |
| Environment | Operational Temperature | 0 ~ 40° C (32 ~ 104° F) | 0 ~ 40° C (32 ~ 104° F) |
| Non-Operational Temperature | -40 ~ 70° C (-40 ~ 156° F) | -40 ~ 70° C (-40 ~ 156° F) | |
| Front I/O Interface | USB3.0 | 2 | 2 |
| Cooling | System Fan | 2 (9 cm / 53 CFM) | 2 (9 cm / 53 CFM) |
| Air Filter | Yes | Yes | |
| Environment | Operating Shock | 10 G (with 11 ms duration, half sine wave) | 10 G (with 11 ms duration, half sine wave) |
| Non-Operating Shock | 30 G | 30 G | |
| Operating Humidity | 10 ~ 85% @ 40° C, non-condensing | 10 ~ 85% @ 40° C, non-condensing | |
| Non-Operating Humidity | 10 ~ 95% @ 60° C, non-condensing | 10 ~ 95% @ 60° C, non-condensing | |
| Operating Vibration (5 ~ 500 Hz) | 1 Grms | 1 Grms | |
| Non-Operating Vibration (5 ~ 500 Hz) | 2 G | 2 G | |
| Physical Characteristics | Weight | 8.5 kg (18.7 lb) | 8.5 kg (18.7 lb) |
| Dimensions (W x H x D) | 482 x 177 x 348 mm (19'' x 7.0'' x 13.7'') | 482 x 177 x 348 mm (19'' x 7.0'' x 13.7'') | |
| Drive Bay | 3.5 External Bay | 2 | |
| 3.5 Internal Bay | - | - | |
| Intelligent System Module | Remote Monitoring | CPU/System fan speed , CPU/System temperature , motherboard voltage | CPU/System fan speed , CPU/System temperature , motherboard voltage |
| Номер компонента | Описание |
|---|---|
| ACP-4020BP-00XE | ACP-4020 Compact 4U Chassis for Half-Size SBC |
| ACP-4020MB-00XE | ACP-4020 Compact 4U Chassis for ATX/Mic |
Компания Корсон Технолоджис РУС предлагает специальные условия доставки оборудования до своих клиентов. В зависимости от типа поставляемой продукции и наличия на складе, сроки доставки варьируются от 1 до 10 дней для готовой продукции и 4-8 недель – для оборудования на заказ.
Наши сильные стороны: